Waste Be Minerals
Tenant / Data Centre Journey

ONE FLOOR
FIFTEEN YEARS

Plug-and-play compatibility with NVIDIA, Cisco, and Juniper. Six-layer encryption. Built into the only AI-native extraction plant on the planet.

100% Uptime + Power

Triple-source power: grid, solar, wind. Battery + mineral-stream resilience baked in.

6-Layer Encryption

Physical, perimeter, network, host, app, and key-vault — independently audited.

Rack Compatibility

NVIDIA HGX, Cisco UCS, Juniper QFX certified. Bring your hardware; we bring the floor.

15-Year Leases

Long-tenor leases with structured indexation. Optional offtake-aligned co-location.

Architecture

Liquid Cooling
Integrated Flow.

Indicative cross-section. Recovery occurs at end-of-life — the techniques stay with us.

Coolant Fluids

Coolant-grade fluids recovered & refined at end-of-life.

Heat-Exchangers

Copper & Aluminium recovered from cold plates.

Magnet-Cooling

Rare-earth Elements returned via the closed-loop wing.

Closed-Loop

Feeds the Closed-Loop Feedstock wing of our Butterfly.

Step 1: Thermal Load
Liquid absorbs heat energy
Step 2: Heat Exchange
Energy dissipated + recovered
Closed-Loop Recovery
Cooled liquid returns for re-use
Material Recovery Route
Documented under MOU

Leasing Status

Four Floors. One is Yours.

04

Floor 4

25,000 sq ft · ~12 MW IT load
Available
03

Floor 3

25,000 sq ft · ~12 MW IT load
Hyperscaler (LOI)
02

Floor 2

25,000 sq ft · ~12 MW IT load
Sovereign AI Tenant
01

Floor 1

25,000 sq ft · ~12 MW IT load
Anchor Tenant

Building Total: 100,000 sq ft · ~48 MW IT load · 6-layer encryption envelope

The numbers your CTO will ask for

100%
Uptime SLA
100%
Power Availability
6
Encryption Layers
15yr
Lease Tenor

See the supply chain
That powers your hardware.

85% of AI hardware depends on a chokepoint. Tour our supply-chain diagram before you tour the floor.